Upcoming Events

National | Miscellaneous

no events match your query!

New Events

National

no events posted in last week

Blog Feeds

Anti-Empire

Anti-Empire

offsite link The Wholesome Photo of the Month Thu May 09, 2024 11:01 | Anti-Empire

offsite link In 3 War Years Russia Will Have Spent $3... Thu May 09, 2024 02:17 | Anti-Empire

offsite link UK Sending Missiles to Be Fired Into Rus... Tue May 07, 2024 14:17 | Marko Marjanović

offsite link US Gives Weapons to Taiwan for Free, The... Fri May 03, 2024 03:55 | Anti-Empire

offsite link Russia Has 17 Percent More Defense Jobs ... Tue Apr 30, 2024 11:56 | Marko Marjanović

Anti-Empire >>

The Saker
A bird's eye view of the vineyard

offsite link Alternative Copy of thesaker.is site is available Thu May 25, 2023 14:38 | Ice-Saker-V6bKu3nz
Alternative site: https://thesaker.si/saker-a... Site was created using the downloads provided Regards Herb

offsite link The Saker blog is now frozen Tue Feb 28, 2023 23:55 | The Saker
Dear friends As I have previously announced, we are now “freezing” the blog.  We are also making archives of the blog available for free download in various formats (see below). 

offsite link What do you make of the Russia and China Partnership? Tue Feb 28, 2023 16:26 | The Saker
by Mr. Allen for the Saker blog Over the last few years, we hear leaders from both Russia and China pronouncing that they have formed a relationship where there are

offsite link Moveable Feast Cafe 2023/02/27 ? Open Thread Mon Feb 27, 2023 19:00 | cafe-uploader
2023/02/27 19:00:02Welcome to the ‘Moveable Feast Cafe’. The ‘Moveable Feast’ is an open thread where readers can post wide ranging observations, articles, rants, off topic and have animate discussions of

offsite link The stage is set for Hybrid World War III Mon Feb 27, 2023 15:50 | The Saker
Pepe Escobar for the Saker blog A powerful feeling rhythms your skin and drums up your soul as you?re immersed in a long walk under persistent snow flurries, pinpointed by

The Saker >>

Public Inquiry
Interested in maladministration. Estd. 2005

offsite link RTEs Sarah McInerney ? Fianna Fail supporter? Anthony

offsite link Joe Duffy is dishonest and untrustworthy Anthony

offsite link Robert Watt complaint: Time for decision by SIPO Anthony

offsite link RTE in breach of its own editorial principles Anthony

offsite link Waiting for SIPO Anthony

Public Inquiry >>

Voltaire Network
Voltaire, international edition

offsite link Netanyahu soon to appear before the US Congress? It will be decisive for the suc... Thu Jul 04, 2024 04:44 | en

offsite link Voltaire, International Newsletter N°93 Fri Jun 28, 2024 14:49 | en

offsite link Will Israel succeed in attacking Lebanon and pushing the United States to nuke I... Fri Jun 28, 2024 14:40 | en

offsite link Will Netanyahu launch tactical nuclear bombs (sic) against Hezbollah, with US su... Thu Jun 27, 2024 12:09 | en

offsite link Will Israel provoke a cataclysm?, by Thierry Meyssan Tue Jun 25, 2024 06:59 | en

Voltaire Network >>

Government outsources “dealing with protestors”

category national | miscellaneous | opinion/analysis author Tuesday April 17, 2007 22:40author by El Bull Report this post to the editors

In February of this year, the government released new forms of contract to be used for the procurement of public sector construction projects. Designed to deliver cost certainty, the new forms of contract transfer considerable risk to the Contractor. It is widely accepted that one of the results of these controversial new contracts will actually be higher construction costs, albeit with certainty about the (higher) contract prices. However, there are some other very significant implications of these new contracts, in particular with regard to how protestors will be treated on construction sites in the future.

Earlier on this year, the government brought into force, without any attendant fanfare or such publicity seeking measures, a brand new form of contract for use on public procurement contracts.

Nothing too exciting here, it might appear. Why shouldn’t the state update its procedures for procuring public projects, with the stated aim of achieving price certainty? After all, if the government is spending billions of our euros, shouldn’t they make sure that they are using the best and most up to date documents & contracts available? Especially given that the Contractors building these projects are creaming it in with massive cost over-runs. Well, just on those issues, there are a few points worth noting:

> The contracts that were in place heretofore for public procurement contracts were long established and have been tried and tested. For example, the “Conditions of Contract for use in connection with Works of Civil Engineering Construction" (third edition) were adopted by the Institution of Engineers of Ireland in 1980 and have had just about every clause tested in the courts, so there was a high degree of legal certainty attached to contracts administered under these conditions.

> Other conditions that have been used in Ireland in recent times, such as the FIDIC suite of contracts, are in use internationally and have the advantage of offering varying degrees of price certainty.

> The introduction of the new contracts this year achieved the remarkable feat of uniting Contractors, Architects, Engineers, Surveyors and their respective organisations in opposition to their introduction. There is unanimous dissatisfaction throughout the industry with these contracts, which are being pushed through by the Dept. of Finance.

But that’s all incidental to the point of this article. I want to discuss a couple of interesting clauses of these new contracts, which haven’t had much of an airing to date. Just before I do, I’ll provide a few more introductory comments on these contracts.

The new Forms of Construction Contracts for Public Works, to give this suite of documents their full title, have been in effect since the 19th February 2007. Their implementation comes on the back of almost 3 years of planning and consultation. They were brought in as a value for money initiative, to address cost over-runs.

The key element of these contracts is that Contractors submitting a tender for a public works contract will have to submit a fixed price lump sum tender. In order to achieve this, it is necessary to clearly set out which risks are assumed by the client and which risks are assumed by the Contractor. One of the most controversial features of these contracts is that a huge amount of risk has been transferred to the Contractor. There is a strong consensus throughout the industry that the government has gone too far and has transferred too much risk to the Contractor. It is widely acknowledged that one of the results of this inappropriate transfer of risks is going to be more expensive contract prices. Isn’t that some irony – the government is getting price certainty, only it’s going to be a higher price! This is almost inevitable, because Contractors putting together a tender for a project will have to include for costs associated with a host of different costs, which may or may not arise in the contract.

There is a very interesting clause tucked away in these contracts. Clause 7.2 transfers all risks associated with Trespassers, onto the Contractor, viz. “…the Contractor shall be responsible for activities of trespassers, protesters and others… on the site”. The implications of this clause are massive.

Picture your typical motorway project going through a woodland that eco-protestors want to protect (not an unknown situation in Ireland). A few dozen environmentalists up a tree halt work. However, it is no longer the government footing the bill (which can run up to millions of euro in no time at all). It’s the Contractor who is responsible for such costs. Now, the question is, how will the Contractor deal with such trespasses onto his site? Methinks that Contractors will be much more sensitive to the costs involved that the government has been previously, and much less accommodating of protestors on their sites.

Another risk that is transferred to the Contractor relates to Archaeological Objects, viz. “If any fossils, coins, antiquities, monuments… are discovered… the Contractor shall not disturb them, but shall take all necessary steps to preserve them, and shall promptly notify the Employers Representative [and comply with any instructions]”. Just picture it – the Contractor is now responsible for preserving any archaeological monument that he comes across during his works. Anyone know the cost of dealing with all those Vikings uncovered during the construction of the Waterford ring road? Anyone think a Contractor will do his best to preserve such findings, in the event of such a discovery under the new contracts?

In conclusion, I would like to point out that my comments are not intended to reflect on the character or motivation of Contractors; rather, they are observations on the financial drivers & motivators that this new suite of contracts gives rise to.

Related Link: http://www.finance.gov.ie/ViewDoc.asp?fn=/documents/publications/other/constructreformdec06.htm&CatI
author by -publication date Wed Apr 18, 2007 00:10author address author phone Report this post to the editors

- Read the article again.

click calender read article
click calender read article

 
© 2001-2024 Independent Media Centre Ireland. Unless otherwise stated by the author, all content is free for non-commercial reuse, reprint, and rebroadcast, on the net and elsewhere. Opinions are those of the contributors and are not necessarily endorsed by Independent Media Centre Ireland. Disclaimer | Privacy