Upcoming Events

National | Environment

no events match your query!

New Events

National

no events posted in last week

Blog Feeds

Anti-Empire

Anti-Empire

offsite link North Korea Increases Aid to Russia, Mos... Tue Nov 19, 2024 12:29 | Marko Marjanovi?

offsite link Trump Assembles a War Cabinet Sat Nov 16, 2024 10:29 | Marko Marjanovi?

offsite link Slavgrinder Ramps Up Into Overdrive Tue Nov 12, 2024 10:29 | Marko Marjanovi?

offsite link ?Existential? Culling to Continue on Com... Mon Nov 11, 2024 10:28 | Marko Marjanovi?

offsite link US to Deploy Military Contractors to Ukr... Sun Nov 10, 2024 02:37 | Field Empty

Anti-Empire >>

The Saker
A bird's eye view of the vineyard

offsite link Alternative Copy of thesaker.is site is available Thu May 25, 2023 14:38 | Ice-Saker-V6bKu3nz
Alternative site: https://thesaker.si/saker-a... Site was created using the downloads provided Regards Herb

offsite link The Saker blog is now frozen Tue Feb 28, 2023 23:55 | The Saker
Dear friends As I have previously announced, we are now “freezing” the blog.? We are also making archives of the blog available for free download in various formats (see below).?

offsite link What do you make of the Russia and China Partnership? Tue Feb 28, 2023 16:26 | The Saker
by Mr. Allen for the Saker blog Over the last few years, we hear leaders from both Russia and China pronouncing that they have formed a relationship where there are

offsite link Moveable Feast Cafe 2023/02/27 ? Open Thread Mon Feb 27, 2023 19:00 | cafe-uploader
2023/02/27 19:00:02Welcome to the ‘Moveable Feast Cafe’. The ‘Moveable Feast’ is an open thread where readers can post wide ranging observations, articles, rants, off topic and have animate discussions of

offsite link The stage is set for Hybrid World War III Mon Feb 27, 2023 15:50 | The Saker
Pepe Escobar for the Saker blog A powerful feeling rhythms your skin and drums up your soul as you?re immersed in a long walk under persistent snow flurries, pinpointed by

The Saker >>

Public Inquiry
Interested in maladministration. Estd. 2005

offsite link RTEs Sarah McInerney ? Fianna Fail?supporter? Anthony

offsite link Joe Duffy is dishonest and untrustworthy Anthony

offsite link Robert Watt complaint: Time for decision by SIPO Anthony

offsite link RTE in breach of its own editorial principles Anthony

offsite link Waiting for SIPO Anthony

Public Inquiry >>

Voltaire Network
Voltaire, international edition

offsite link Russia Prepares to Respond to the Armageddon Wanted by the Biden Administration ... Tue Nov 26, 2024 06:56 | en

offsite link Voltaire, International Newsletter N?109 Fri Nov 22, 2024 14:00 | en

offsite link Joe Biden and Keir Starmer authorize NATO to guide ATACMS and Storm Shadows mis... Fri Nov 22, 2024 13:41 | en

offsite link Donald Trump, an Andrew Jackson 2.0? , by Thierry Meyssan Tue Nov 19, 2024 06:59 | en

offsite link Voltaire, International Newsletter N?108 Sat Nov 16, 2024 07:06 | en

Voltaire Network >>

Revised Wind Farm Guidelines will do nothing

category national | environment | press release author Thursday December 12, 2013 10:32author by foie - Friends of the Irish Environmentauthor email admin at friendsoftheirishenvironment dot orgauthor phone Tel & Fax: 353 (0)27 74771 Report this post to the editors

PRESS RELEASE - Friends of the Irish Environment -11 December 2013

The revised wind guidelines published today by the Minister for Environment do not address most of the key issues concerning windfarms and fail to provide any detail on the single issue of noise and flicker they do address

The document is described as a ‘work in progress’, with the details of noise yet to be settled.

These ‘details’ include special locations, the impact of cumulative noise, the noise prediction methods to be used, the inspection and monitoring regime on foot of complaints under EU regulations and any remedial actions. In fact, it is the type of insidious noise that is the issue for residents more than the level, which is all these Guidelines address.

Our organisation has been overwhelmed with requests for help from the public faced with these developments in their backyards, partly because of the lax planning policy over the last 20 years makes it difficult to find locations where there are not now dwellings.

While many people would accept one well-sited wind farm, in many cases the entire rural landscape is being transformed around them into huge industrial developments that are entirely inappropriate, often in remote, scenic upland areas that can also represent the last refuge of our wildlife. Because many of our uplands are composed of peat soils, these are being drained, with damage to wildlife, pollution to local watercourses and loss of Ireland’s unique carbon storage.

In one case we are assisting residents in an appeal where a previous An Bord Pleanala appeal decision reduced the number of turbines proposed from 210 to 180. Yet a new application granted by the Council was for an additional 48 turbines, even more than were previously removed by the Board. [Cluddaun WInd Farm, Co Mayo]. The size of the turbines has also increased dramatically, requiring larger and larger bases, service roads and disturbance through construction.

Because of the Government’s blinkered support of windfarms to meet our alternative energy quota by 2020, other methods of power generation through more secure sources such as wave, water and biomass have been starved of funding.

These Guidelines change nothing and will do nothing to address the fundamental questions of Ireland’s need for sustainable renewable energy.

Verification and comments:

Tony Lowes

Editors notes:

The indicative list of matters to be considered in Appendixes to come include

Noise sensitive locations and representative locations
Cumulative Noise Guidelines on the way you assess noise (Noise survey methodology)
the data and modelling requirements for wind turbine noise assessment.
noise prediction methods;
Special Audible Characteristics;
Commissioning Requirements;
monitoring and compliance regime post construction;
Commissioning report on noise levels.
Compliance noise surveys during life of wind farm.
Remediation measures to be implemented if non- compliance is found. • Complaints
The inspectiojh and monitoring regine under EU regulations (RMCEI10).
Monitoring post commissioning (To be agreed with LA and time frame).
Monitoring on foot of complaints (To be agreed with LA and time frame).
Remedial actions (Time frame and measures needed).

© 2001-2024 Independent Media Centre Ireland. Unless otherwise stated by the author, all content is free for non-commercial reuse, reprint, and rebroadcast, on the net and elsewhere. Opinions are those of the contributors and are not necessarily endorsed by Independent Media Centre Ireland. Disclaimer | Privacy