Upcoming Events

Galway | Environment

no events match your query!

New Events

Galway

no events posted in last week

Blog Feeds

Anti-Empire

Anti-Empire

offsite link The Wholesome Photo of the Month Thu May 09, 2024 11:01 | Anti-Empire

offsite link In 3 War Years Russia Will Have Spent $3... Thu May 09, 2024 02:17 | Anti-Empire

offsite link UK Sending Missiles to Be Fired Into Rus... Tue May 07, 2024 14:17 | Marko Marjanović

offsite link US Gives Weapons to Taiwan for Free, The... Fri May 03, 2024 03:55 | Anti-Empire

offsite link Russia Has 17 Percent More Defense Jobs ... Tue Apr 30, 2024 11:56 | Marko Marjanović

Anti-Empire >>

The Saker
A bird's eye view of the vineyard

offsite link Alternative Copy of thesaker.is site is available Thu May 25, 2023 14:38 | Ice-Saker-V6bKu3nz
Alternative site: https://thesaker.si/saker-a... Site was created using the downloads provided Regards Herb

offsite link The Saker blog is now frozen Tue Feb 28, 2023 23:55 | The Saker
Dear friends As I have previously announced, we are now “freezing” the blog.  We are also making archives of the blog available for free download in various formats (see below). 

offsite link What do you make of the Russia and China Partnership? Tue Feb 28, 2023 16:26 | The Saker
by Mr. Allen for the Saker blog Over the last few years, we hear leaders from both Russia and China pronouncing that they have formed a relationship where there are

offsite link Moveable Feast Cafe 2023/02/27 ? Open Thread Mon Feb 27, 2023 19:00 | cafe-uploader
2023/02/27 19:00:02Welcome to the ‘Moveable Feast Cafe’. The ‘Moveable Feast’ is an open thread where readers can post wide ranging observations, articles, rants, off topic and have animate discussions of

offsite link The stage is set for Hybrid World War III Mon Feb 27, 2023 15:50 | The Saker
Pepe Escobar for the Saker blog A powerful feeling rhythms your skin and drums up your soul as you?re immersed in a long walk under persistent snow flurries, pinpointed by

The Saker >>

Public Inquiry
Interested in maladministration. Estd. 2005

offsite link RTEs Sarah McInerney ? Fianna Fail supporter? Anthony

offsite link Joe Duffy is dishonest and untrustworthy Anthony

offsite link Robert Watt complaint: Time for decision by SIPO Anthony

offsite link RTE in breach of its own editorial principles Anthony

offsite link Waiting for SIPO Anthony

Public Inquiry >>

Human Rights in Ireland
Indymedia Ireland is a volunteer-run non-commercial open publishing website for local and international news, opinion & analysis, press releases and events. Its main objective is to enable the public to participate in reporting and analysis of the news and other important events and aspects of our daily lives and thereby give a voice to people.

offsite link Julian Assange is finally free ! Tue Jun 25, 2024 21:11 | indy

offsite link Stand With Palestine: Workplace Day of Action on Naksa Day Thu May 30, 2024 21:55 | indy

offsite link It is Chemtrails Month and Time to Visit this Topic Thu May 30, 2024 00:01 | indy

offsite link Hamburg 14.05. "Rote" Flora Reoccupied By Internationalists Wed May 15, 2024 15:49 | Internationalist left

offsite link Eddie Hobbs Breaks the Silence Exposing the Hidden Agenda Behind the WHO Treaty Sat May 11, 2024 22:41 | indy

Human Rights in Ireland >>

Bord Pleanala M17 Decision Invalid Under EU Law

category galway | environment | press release author Thursday May 07, 2009 22:53author by Brian Guckian Report this post to the editors

Inspector's Report Void; Motorway Decision Must be Overturned - Researcher

The An Bord Pleanala Inspector's Report into the proposed M17 Rathmorrissy to Tuam motorway scheme is severely flawed and contravenes EU legislation on Environmental Impact Assessment, independent sustainable transport researcher and campaigner Brian Guckian has stated.


PRESS RELEASE

For Release 5/5/2009

Mr. Guckian, who carries out research and development into sustainable transport nationally and who has been involved in campaigns against a number of road schemes including the M3 in Meath, the Outer Bypass in Galway city and the N25 in New Ross, has analysed the report used by the Board to give permission for the scheme on March 6th last and said that it did not comply with the provisions of the EU Directive on Environmental Impact Assessment (EIA).

He found that the Inspector had not carried out an objective assessment of the proposal, nor had he taken account of alternative, sustainable transport modes such as rail, coach and bus, as implied in the provisions of the Directive.

The Inspector had been negligent in failing to acknowledge that large traffic volumes were a problem that needed to be tackled at source, not simply catered for by providing additional roadspace.

Mr. Guckian said he had been disturbed by the very poor quality of the Inspector's report, particularly as there had been no reference to national sustainable transport, energy and development policies, and alternatives had not been properly assessed.

It had also been found that the scheme would not reduce CO2 emissions, contrary to national policy on climate change, yet the Inspector had recommended it should proceed regardless.

On the basis of the inadequate Inspector's Report, the Board's decision to grant permission for the proposed scheme was unsafe and had to be overturned. The CPOs for the proposed scheme were also invalid as the process leading to their approval had been found to be seriously deficient.

Mr. Guckian said that traffic volumes on the existing Galway - Tuam corridor could be reduced from around 24,000 vehicles per day to less than 10,000 per day if high-quality, high-frequency coach and rail transport was introduced along with local job creation policies to reduce commuting to and from the city.

This would avoid unsustainable and unacceptable new road construction and permit significant in-line improvements to the existing N17, including a bypass of Claregalway and implementation of a more sustainable road type such as a Type 3 Dual Carriageway. However, this responsible and progressive approach had been ignored in the planning process for the M17.

Mr. Guckian stressed that there were no economic advantages to road-building given what was now known about the enormous potential costs of climate change arising from runaway CO2 emissions from transport, most of which were from unsustainable road-based modes such as car and HGV, and the costs of oil dependency. He said that businesses in the region needed education in relation to sustainable, energy-efficient transport as they seemed to be stuck with a 1960s view of untrammelled road-building solving transport problems and allegedly stimulating economic development.

Instead, motorways were in reality an outmoded, negative form of infrastructure with huge downstream energy and environmental costs, and genuine economic development was actually about innovation, productivity, localisation and sustainable transportation, among other factors.

Mr. Guckian said he was concerned about the ongoing enthusiasm of Galway Co. Council for inappropriate and unsustainable US-style highways, and rather than being in thrall to this redundant and inappropriate thinking from the 1960s, the Council should instead be taking its cue from best practice in contemporary sustainable transport and community development as seen in countries like Sweden, Switzerland, Denmark, Austria, Germany, France and Spain.

The Atlantic Road Corridor did not have to be to motorway specification and in September 2008 a Representation was made to the Minister for Transport to have it re-designated as a model, combined road and rail Sustainable Transport Corridor.

People also had to be fully involved in the planning of sustainable transport in their communities rather than being presented with a fait accompli by council roads engineers, a practice which was contrary to the EIA Directive as well as the UN Aarhus Convention on Access to Information, Public Participation in Decision-making and Access to Justice in Environmental Matters, to which Ireland was a signatory.

Mr. Guckian welcomed the fact that Judicial Review proceedings were currently underway in the related Galway City Outer Bypass case which featured similar failures in its environmental assessment, increasing CO2 emissions and exacerbating rather than reducing traffic congestion. However, Judicial Review was not generally available to Irish Citizens due to the prohibitive costs involved, which was also contrary to Article 10(a) of the EIA Directive.

The M17 would have to be withdrawn via Ministerial or other intervention in the absence of Judicial Review proceedings, and disconnected from the separate N18 Gort to Oranmore scheme.

He further stated he was seeking a stay on all road scheme approvals pending a statutory inquiry into the operations of An Bord Pleanala as they had rarely acted impartially or satisfactorily in the area of road construction scheme assessment. A study carried out jointly by the Dublin-based sustainable development organisation FEASTA and the Environmental Protection Agency (EPA) in 2006 had found very serious shortcomings in the Board's assessment and decision-making processes.

It was also not widely known that the current National Development Plan (NDP) was also contrary to EU law as it had not fulfilled requirements for public participation and environmental assessment as set out in the EU Directive on Strategic Environmental Assessment (SEA).

Mr. Guckian indicated that local people, including those affected by the invalid CPO process, could Petition the European Parliament regarding the M17.

ENDS

Contact: Brian Guckian 087 9140105 railprojects@eircom.net

© 2001-2024 Independent Media Centre Ireland. Unless otherwise stated by the author, all content is free for non-commercial reuse, reprint, and rebroadcast, on the net and elsewhere. Opinions are those of the contributors and are not necessarily endorsed by Independent Media Centre Ireland. Disclaimer | Privacy